DTi is a professional chemical testing organization around you!

0755-32936716

Hotline:13923722641

News

Real-time dynamic update of company/industry news

Position:Home > News > question

Guide to Obtaining a Children's Cream Kitchen EU EN71 Test Report

Date:2026-07-31 09:28:52 Classification :【question】 Visits:
Guide to Obtaining a Children's Cream Kitchen EU EN71 Test Report

I. Overview of EN71 Standard

EN71 is a mandatory safety standard in the European Union for toys for children under 14 years old, comprising several parts:

| Part | Test Content

| EN71-1 | Mechanical and Physical Properties (Structural Safety, Sharp Edges, Small Parts, etc.)

| EN71-2 | Flame Retardancy

| EN71-3 | Migratable Chemical Elements (19 elements including heavy metals)

| EN71-4 | Chemical Experiment Kits

| EN71-5 | Non-Experimental Chemical Toys

| EN71-8 | Household Activity Toys

| EN71-9 | Organic Compounds

| EN71-10 | Organic Compounds (Analysis)

| EN71-11 | Organic Compounds (Analytical Methods)

| EN71-12 | N-Nitrosamines and N-Nitrosamines

| EN71-13 | Scent-based toys, cosmetic sets, and taste games.

Children's cream kitchen toys typically comply with EN71-1 (construction of plastic/metal kitchen utensils), EN71-2 (flame retardancy), and EN71-3 (chemical safety of materials in contact with food or children).

II. Core Testing Items

1. Mechanical and Physical Testing (EN71-1)

Small parts testing (to prevent accidental swallowing by children under 3 years old)

Sharp edges and angles testing

Folding mechanism and hinge testing

Tension and torsion testing

Compression and impact resistance testing

2. Chemical Testing (EN71-3)

Migration of 8 heavy metals: Lead (Pb), Cadmium (Cd), Mercury (Hg), Chromium (Cr), Arsenic (As), Barium (Ba), Selenium (Se), Antimony (Sb)

And other elements such as copper, zinc, nickel, cobalt, manganese, and aluminum (19 elements in the latest version)

Special Note: Cream toys may contain plastics, rubber, and coatings; phthalates need to be tested.

3. Flame Retardant Testing (EN71-2)

Burning rate testing

Applicable to flammable materials such as plastics and fabrics

4. Food Contact Materials (if applicable)

If the product claims to be safe for food contact, it must comply with EU 1935/2004. Food Contact Regulations

III. Application Process

Step 1: Select a testing organization → Step 2: Submit an application → Step 3: Send samples →

Step 4: Laboratory testing → Step 5: Test passed → Step 6: Report issued →

Step 7: Affix CE marking → Step 8: Sign the Declaration of Conformity (DOC)

Detailed Steps

1. Select a certification body (DEZEW Testing CNAS Registration No.: L8083)

2. Fill out the application form and provide product information (material, color, specifications, packaging)

3. Send samples: Usually 3-5 sets of finished products (including packaging) are required.

4. Sample testing: The laboratory conducts mechanical, chemical, and flame retardant tests.

5. Report issuance: An English version of the EN71 test report is issued after the test passes.

6. Certificate issuance: The organization issues a certificate of conformity (some organizations provide this).

7. Follow-up work: Affix the CE marking and prepare technical documents.

IV. Required Documents List

| No. | Document Name | Description | 1 | Product Manual | Chinese and English versions, including functional descriptions

| 2 | Product Structure Diagram/Exploded View | Showing all components and materials

| 3 | Material List | Indicating the materials of each component (e.g., ABS, PP, stainless steel, etc.)

| 4 | Color Photos | High-resolution images of the product from various angles

| 5 | Packaging Design | Sales packaging (including CE mark location)

| 6 | Application Form | Template provided by the organization

| 7 | Samples | 3-5 complete sample sets

V. Costs and Timeline

Reference Costs (Market Prices)

Single EN71-1 Test: Approx. 2,000-4,000 RMB

Single EN71-3 Test: Approx. 3,000-6,000 RMB

Single EN71-2 Test: Approx. 2,000-3,500 RMB

EN71-1+2+3 Package: Approx. 7,000-15,000 RMB

Full EN71 testing: Approximately 15,000-30,000 RMB

The above prices are for reference only; the actual price depends on the complexity of the product and the pricing of the testing institution.

Testing Cycle

Routine Testing: 5-7 working days

Expedited Testing: 3-5 working days (cost increased by 30%-50%)

VI. Precautions

Key Reminders

1. Material Risk Control: Phthalate content (DEHP, DBP, BBP ≤ 0.1%) in plastic parts of toys (especially colored parts in cream toys) requires strict control.

2. Small Parts Risk: Small parts such as eggs, spoons, and spatulas used in simulated kitchens must pass the EN71-1 small parts test.

3. Age Labeling: The applicable age (e.g., 3+, 6+) must be clearly stated on the packaging.

4. Warning Statements: Must include bilingual (target language) warning statements as required by the EU.

5. CE Marking: The circular CE marking must be at least 5mm high.

6. DOC Documentation: The manufacturer must sign an EU Declaration of Conformity.

7. Responsible Entity: The manufacturer or its authorized representative in the EU (EC). (REP) Legal Liability

Cost Reduction Suggestions

For exports to multiple countries, a series of model reports can be processed to spread the costs.

Choose a suitable laboratory: SGS/Intertek are authoritative but expensive; TUV/CTI offer better value.

Confirm product materials in advance to avoid repeated sample submissions.

VII. Processing Suggestions

Find a reputable institution

It is recommended to choose a laboratory accredited by CNAS and CMA and possessing EU Notified Body qualifications. These can be verified on the website of the National Certification and Accreditation Administration.

Subsequent EU Compliance

After obtaining the EN71 report, the following are also required:

CE Technical Construction File

EU Declaration of Conformity (DOC)

EU Authorized Representative (if the company is not located in the EU)

Product Registration (required in some countries)

Summary: The core of obtaining an EN71 report for children's cream kitchen products is mechanical and physical safety and chemical migration testing. It is recommended that companies involve testing during the product design stage (rather than post-production testing), which can significantly reduce costs and shorten the cycle.

Copyright © Shenzhen DTi Technology Testing Co., Ltd. All Rights Reserved Record number: 粤ICP备18006753号-2  Shen Gongwang Security: 44030602006947
13923722641

报价二维码

报价二维码